FRENCH FRIGATE SHOALS
F&SNO.
22009
USER
TITLE
Weather Station, USAF Air Weather Service (AWS)
STRUCTURE FACILITY NO.
JTF -8
| SCIENTIFIC STATION NO.
None
FUNDING
AGENCY
($000)
BoD
None
ENGR
JTE
MILCON
PRE-GO
Prior Costs*
CRO 7-65
POST -GO
PROC
FOO GO+3
TOTAL
2.0
FURN
2.0
Estimate 12/65
TOTAL
CONST
GO+23
2.0
26.0
26. Ox
26.0
28.0
PRIOR YEARS
ENGINEERING
Completed.
Drawings:
93-002-C2
93-038-Cl and El
TYP 035-Al and A3
TYP 036-Al
POST-GO
PROCUREMENT
To be accomplished.
CONSTRUCTION
The contractor will furnish the following items:
lo x 32~ft. tents;
b) four 4+ x 4 x 6-ft. hot lockers: and,
a) two
c) two 20 kw, 120/203
volt, 00 cycle, 3 phase generators. One of the generators will be utilized as a
back up power source. In the event a central power system for the island is
provided, only the back up generator will be required.
The contractor will perform the following: a) prepare a level 60 x 250-ft. site
oriented to the prevailing winds; when siting scientific equipment, obstructions
within 500 yards in excess of 5° above the surtace as well as signal reflections
from metal buildings should be avoided; b) erect a 16 x 32-ft. joint operations
tent, with flooring,
screen doors and screen siding with side tlaps extended at
the approximate slope of the tent roof for the use of AWS and communications
personnel;
c) erecta 16 x 32-ft.
ventilation and insect control;
maintenance and supply tent,
screened for
4) install four hot lockers for storage of elec ~
tronic spare parts; 3) construct one 10 x 10-ft. concrete pad with ground rod
in center; f) construct a 3 x 3-ft. concrete pad, with tie-down rings, located
*Includes engineering costs for F&S Nos. 21014, 21015, 22010, 25010, 25011
and 26005.
**Includes construction costs for F&S No. 22010.