FRENCH FRIGATE SHOALS
F&SNO.
TITLE
22008
USER
Fireball and Debris Cloud Motion Photography - Subtask A804
STRUCTURE, FACILITY NO.
EG&G
FUNDING
AGENCY
SCIENTIFIC STATION NO.
($000)
ENGR
POST -GO
BOD
93-36
None
TC/
PROC
CONST
TOTAL
GO+120
FO0GO+140
FURN
TO BE DETERMINED
POST -GO
ENGINEERING
To be accomplished.
PROCUREMENT
To be accomplished.
CONSTRUCTION Test Command will furnish the following: a) one 8 x 24 x 12ft. photo processingtrailer; b}) one 8 x 24 x 12-ft. workshop trailer; c) two
ox 6x 7-ft.
transportainers; and,
d) one Radio Receiver, RC-2, voice count-
down. The phototrailer is equipped with electronic/photographic equipment
and the workshop trailer is furnished with one drill press, one 14-inch band
saw and a 5-inch electric bench grinder.
Services required for Subtask A804 include the following: a) communication
facilities for a command link between JA, Hickam AFB, French Frigate Shoals
and Kauai A804 sites;
b) one HF Ground Scientific Net between Hickam AFB
Hangar Number 2, Hickam AFB Trailer Park, Kauai and French Frigate Shoals
A804 sites; c) meteorological service on French Frigate Shoals to include a
daily synopsis of wind, pressure, temperature, dew point and relative humidity
from ground surface to 100, 000-ft.; d) air shipment of photographic film from
French Frigate Shoals to Hickam AFB ona daily basis; and, e) rations and
quarters for Subtask A804 personnel.
The contractor will furnish the following: a) one 12,000 BTU air conditioning/
dehumidifier for the electronic equipment; b) two 15 kw, 120/240 volt, 60 cycle,
single phase generators,
one generator will be utilized as a back up power
source; in the event a central power source is available, a back up generator is
still required;
c) one 8 x 32-ft.
screened tent with wooden flooring; and,
d) one
400 gallon water tank.
The contractor will perform the following: a) prepare site, free from ocean
spray, with a clear line-of-sight from the southern horizon in the direction of
Johnston Island to 45 degrees above the northern horizon in the direction of
the magnetic meridan;
d) erect tent;
b) provide a fourth order survey;
c) position trailers;
e) make necessary hookup and electrical connections; and,