—__aumaein,
CANTON
F&S NO.
TITLE
21015
Weather Station,
USER
STRUCTURE FACILITY NO.
JTF -8
SCIENTIFIC STATION NO.
None
FUNDING
AGENCY
($000)
JTF
PRE-GO
CRO7-65
POST-GO
MILCON
USAF Air Weather Service (AWS)
BOD
None
ENGR
PROC
CONST
GO+e3
FODGO+30
TOTAL
FURN
Engineering costs included in F&S No. 22009
Estimate 12/65
TOTAL
26.0
26.0%
26.0
26. 0%
PRIOR YEARS
ENGINEERING
Completed.
Drawings:
108-002-C2
108-038-Cl1 and El
TYP 035-Al and A3
TYP 036-Al
POST-GO
PROCUREMENT
To be accomplished.
CONSTRUCTION
The contractor furnished items include:
b) four 4 x4 x 6-ft. hot lockers; and,
c) two 20 kw,
a) two 16 x 32-ft. tents
120/208 volt,
60 cycle,
3
phase generators. One of the generators is utilized as a back up power source.
In the event a central power system for the island is provided, only the back up
generator is required.
The contractor will perform the following: a) prepare a level 60 x 250-ft. site
oriented to the prevailing winds; when siting scientific equipment, obstructions
within 500 yards in excess of 50 above the surface as well as signal reflections
from the metal buildings should be avoided; b) erect a 16 x 32-ft. joint operations tent, with flooring, screen doors and screen siding with side flaps ex-
tended at the approximate slope of the tent roof for the use of AWS and communi cations personnel ; c) erecta 16 x 32~ft. maintenance and supply tent, screened
for ventilation and insect control;
electronic spare parts;
d} install four hot lockers for storage of
e) construct one 10 x 10-ft. concrete pad with ground
rod in center; f) constructa 3 x 3-ft. concrete pad, with tie-down rings, located approximately 800-ft. within line-of-sight of the operations tent; and,
*Includes construction costs for F&S No. 21014.
VOLII
Spee
21-12
aR.