CANTON
F&SNO.
TITLE
21014
Communication Center
(U. S. Army Strategic Communication Command)
USER
STRUCTURE FACILITY NO.
JTE-8
SCIENTIFIC STATION NO.
None
BoD GO +23
None
FOD GO+30
FUNDING
AGENCY
JTF
MILCON
CRO7-65
($000)
-|
ENGR
PROC
CONST
TOTAL
FURN
PRE-GO
Engineering costs are included in F&S No. 22009,
POST-GO
Construction cost estimate included in F&S No.
25010.
PRIOR YEARS
ENGINEERING
Completed.
Drawings:
108-002-C2
108-038-Cl and El
TYP-035-Al and A3
TYP-036-Al
POST -GO
PROCUREMENT
To be accomplished.
CONSTRUCTION
The U. 5S. Army Strategic Communication Command will furn-
ish 2 communication vans.
The contractor will construct a 20 x 20-ft. concrete
pad for siting the communication vans.
The Communication Center will share the maintenance and joint operations tents
with the U. S. Air Force Air Weather Service facility (F&S No. 21015). A site
will be established after a reconnaissance of the area has been made by Air Weather Service personnel.
Refer to Figure A-18, Appendix A, for possible site locations. Transmitting, receiving and cryptographic service will be provided to
all agencies located on this island.
One officer and 44 EM from a Provisional
Army Signal Unit (PASU), Team A-3, will operate the communication center at
this location,
21-11
VOL IL
April 1969