eer.
KAUAI,
AEC-TRFE
F &S NO.
SUPPORT
TITLE
12008
Roads
USER
STRUCTURE FACILITY NO.
JTF
SCIENTIFIC STATION NO.
None
Bop
None
FOD
FUNDING
AGENCY
($000)
AEC
ENGR
PRE-GO
Prior Cost
PROC
CONST
Cost included in F&S No.
TOTAL
FURN
11024
POST-GO
Estimate
TO BE DETERMINED
PRIOR YEARS
ENGINEERING
Completed.
Drawings:
F 97-002-Cl thru C4
97-3224B-C2 thru C4
JS 97-3224C-Cl
thru C5 and C7
PROCUREMENT
Completed.
CONSTRUCTION
The main entrance road to the AEC-TRF is approximately
1 1/2 miles long and is composed of asphaltic concrete varying in thickness
from 11/2 to 3 inches. The roadway widthis 20-ft. Guardrails and warning
Signs are installed alongside the road, where needed.
A 50-ft.
(Completed in 1965.)
long sheet pile retaining wall is provided where the roadbed passes
over a drainage canal.
bedded in the roadbed,
Water is pumped across the road through a pipe em-
Stabilized coral roads branch from the main road to the AME Field and to the
Rawidar Trailer Dock.
A stabilized coral road extends east-west along the
southern border of the launch complex and extends to Balloon Release Station
No.
2,
POST -GO
ENGINEERING
To be accomplished.
PROCUREMENT
To be accomplished.
CONSTRUCTION
Access roads will be installed to the Post-GO launch pads
and Rocket Motor Staging and Holding Area.
12-6
VOL II