Oishi NASBARBERS POINT F & 5 NO. TITLE 10015 SUPPOR Area Security Modifications USER STRUCTURE ‘FACILITY NO. JTF SCIENTIFIC STATION NO. Various; see Text FUNDING AGENCY ($000) AEC ENGR BoD None PROC CONST FOD TOTAL FURN PRE-GO Prior Cost TOTAL 1.2 3.4 4.6 1.2 3.4 4.6 COMPLETED DESCRIPTION Control Center (Building 947) The Control Center atop Building 947 is anair conditioned 10 x 10 x 8-ft. high concrete block structurewithconcrete floor and roof slabs and an insulated built- up roof. Access is via a ladder from ground level up through a trapdoor in the floor. Bulletproof windows and gunports are provided on all sides. (Completed in 1964.) Surveillance of the entire assembly area is possible from the Control Center except for a sector to the southwest whichis obstructed by Assembly Building 1082. (Costs for this facility are included in F&S No. 09001--Assembly Building). Guardhouses 1683 and 1688 New counters and tables installed in Guardhouses 1683 (east of the Assembly Building) and 1688 (in the Secure Trailer Compound) were arranged so the guard could face the entry gate at all times while performing his duties. A new glasslouvered door and security corridor were also installed at each guardhouse. The corridors, of 4-ft. high chain link fence extending from the gates to the guardhouses, prevent unauthorized wandering in the area by channeling personnel directly to the guardhouses. (The costs for Guardhouse 1688 are included under F&S No. 05013). Additional Guardhouse A 6 x 6-ft. skid-mounted guardhouse was placed at the southeast corner of the road intersection west of the Secure Trailer Compound. 10-3 (Completed in 1966.) VOL II

Select target paragraph3