Fasng’°
07061
TITLe:
| 4.S
USER
SANDIA
EG&G
gator Station
WEE
TIREFACILITY NO.
“ger None
None
eee
FUNDING
($000)
AGENCY
AEC
SCIENTIFIC STATION NO, ~ wd a
ENGR
PROC
CONST
aS
TOTAL
PRE -GO
Prior Cost
FY 69
2.3
0.9
12.8 «2 ©. 15.1
15.2
16. |
LOTAL
3.4
63.
31.4
PRIOR YEARS
ENGINEERING
Completed.
Drawings: JS 95-071-A3
JS 9SH-071-Cl
JS 95-O71H-ET . 95-079-WI,_ a
~
PROCUREMENT Completed.
+
ye
..
tf
a
Sees
Rag
CONSTRUCTION An earth platform (completed in 1966} elevated above theS
Surrounding terrain and approximately 40 x 100-ft. in plan is used asa
Simulator facility for calibrating instruments aboard the diagnostic aircraft.
The platform was enlarged from its original size of 40 x 40-ft.
The simulator site is approximately 800-ft. south of the diagnostic aircraft
parking area. An electromagnetic clear zone and unobstructed line-of-sight
is maintained from the site to the aircraft.
The EG&G simulator components.are housed in an 8 x 1Z-ft. shed 8-ft. high.
The Sandia facilities are located in the 8 1/2 x 34-ft.. trailer, designated A-1,
which is shipped to Hickam from Kirtland AFB when required for exercises.
Approximately, 50 kw, MEvolt, 3 phase power is supplied to the simulator
site from thé. t@@f¥er park Substation.
phone cable. og
and with the
ytrailer compound.
ee
ENGINEERING
Drawings:
Direct burial signal cable andtele-
ets the simulator facilities with the aircraft parking area
FY 1969
Completed.
JS 95H-071-C2
JS 95H-071-W1
PROCUREMENT In progress.
7-47
.
VOL I!
°
:
*,