Rehabilitate Building 7 at Bishop» Point
USER
STRUCTURE FACILITY NO.
TG 8.4
;
FUNDING
AGENCY
JTF/
MILCON
SCIENTIFIC STATION NO.
7
($000)
BoD
None
ENGR
PROC
PRE-GO
Prior Cost
FOD
CONST
TOTAL
65.1
65.1
FURN
CRO 10-64
AEC
Prior Cost
DPWO
Prior Cost
TOTAL
lied
1.2
1,2
25.4
e534
90,5
91.7
COMPLETED
DESCRIPTION Engineering, procurement and construction for the rehabilitation of Building 7 were done by OICC, Mid Pacific, Pearl Harbor, Hawaii.
Original rehabilitation consisted of repairing and painting interior walls and partitions, replacement of asphalt tile, repair o: plumbing, restoration of latrine
fixtures on the first floor and replacement of a hot water boiler. (Completed in
1964.)
Additional rehabilitation included partitioning the open bays with partial dividers
to provide two-man cubicles for approximately 130 airmen. Venetian blinds or
blackout curtains were installed on the windows, and floor runners were installed
in the hallways. Each cubicle has been provided with individual clamp type lights
and two duplex convenience outlets. Rooms at the end of each main hall have been
completely enclosed and provided with doors. Electrical panels were reworked to
provide separate circuits for large bays, halls and latrine areas. Each of the
large bays was provided with individual master light switches. (Completed in
1965.)
Four commercial automatic clothes washers and three commercial dryers have
been procured and installed for use in the building.