operations:

(a)

Where practical, existing station monuments of the two previous
surveys will be recovered and incorvorated into the proposed
scheme.

A minimum number of stations will be tied in to allow

a check to be made between the results of this survey and that
of the Joint Task Force Seven Survey.
(>)

Existing towers can be adapted to the requirements of the survey
and new towers erected at remaining locations as shown on following list:
TOWER ERECTION

Station
Name

Location

Aniyaanii
Parry

Kodak
Steel

Use existing steel tower
"
"
"
n

Photo
N. Base

"
i
"
Erect new 15' tower

Eniwetok

Priviledge

Runit
Engebi

Runit

Lagoon
Runit

Aomon
Eniwetok (S)

Sand Spit
Lagoon

"

"

"

"

"

n
"
"
"
New 10' tower on existing

--

Sand
Coral

Lleve 30!
Elev. 30

Elev. 30

Elev. 26
Elev. 20

Bleve 20

concrete structures

Elev. 25

concrete structures
Erect new 25' tower

Eleve 25
Elev. 15

New 10' tower on existing

Lagoon

Bogallua

Required
Rlevation

Description

"

tt

nt

"

"

"oon

"

Erect new 10' tower
Erect new 15' tower

Elev. 35

Elev. 25

Elev. 10
Elev. 22

l, Stations - use existing towers
3 Stations = erect 25' towers
3 Stations - erect 10' towers

_2 Stations - erect 15' towers

13

Adapting the four steel towers to survey requirements will consist of constructing a platform at the twenty-five foot level and erecting a wooden instrument
tripod to the twenty-nine foot level.

These heights may be modified after ob-

taining the heights of the tower bases above the level of the lagoon.

Allow-

ance is made for curavture of the earth and a ten-foot minimum clearance above

v-5