as
21.

That hot-mix asphaltic paving be used for the area surrounding Zero
Towers and for air strips.

226

That an asphaltic road-mix surfacing be used for frequently traveled
roads.

236

That stabilization of zero line and other areas for the purpose of

reducing the amount of dust which will rise be accomplished by
asphaltic road-mix surfacing.

2he

That existing piers near the south em of Eniwetok, the north pier
on Parry and on Runit, Aomon and Engebi Islands be repaired and reconstructed.

256

That new piers be constructed near north end of Eniwetok, near air
strip on Parry, at Rojoa and at Bogallua if that island is used.

26.

That new fuel storage with submarine receiving lines to deep water
be provided.

27 6

That sheet aluminum alloy for building construction be allocated
immediately.

28.

That the entire program of planning, design, construction operation
and maintenance can best be accomplished under a single contractual
agreement covering all phases of the program.

VIII - 3

Select target paragraph3