SECTION

I

pénuities under applioable Pideral cows.”

INTRODUCTION
AUTHORITY FOR REPORT:

By a letter from Mr. Carroll L. Tyler, itanager Santa Fe Directed Operations, U. S. Atamic Energy Commission, to iolmes and Narver, dated September

16, 1948, this firm was authorized to make a preliminary reconnaissance and
study of the proving ground site at Eniwetok Atoll for the purpose of determining such information as is necessary to formulate a construction program,
recommend types of construction, prepare cost estimates and submit a comprehensive report of our findings.
Authority for the basic functional criteria, such as population, radiology, date of tests, demand utility loads, and geographical distribution of
various proving ground functions, derives from a series of conferences between

representatives of Holmes and Narver, and J Division of the Los Alamos Laboratory, presided over by Dr. Alvin C. Graves during the week of November 15,
1948.
PURPOSE OF REPORT:
The purpose of this Report is an engineering analysis of design problems
and construction problems involved in utilities am structures necessary for

a proposed Atomic Energy Proving Ground at Eniwetok Atoll in the Marshall Islands.

This Report will not undertake the scientific or experimental aspects

of such a Proving Ground, but will analyze certain of the facilities necessary
for such experiments, as well as a proposed schedule for accomplishing and op=
erating such facilities.

It is intended as a forecast of probable scope of

work as a basis for which logistic scheduling can be accomplished, and approx=imate estimates of cost for budgeting purposes can be prepared.

It may also

constitute a framework for the formlating of policy and drawing of contracts
for actual accomplishment.